Search Results:

Dairy Application: Turnkey Solution

FRC has been the trusted engineer to help manage the wastewater treatment needs for this Canadian based top ten worldwide dairy processor as they grow and expand across North America. This particular facility generates over 360,000 gallons of wastewater per day. The original wastewater treatment system design consisted of a biotower, a Continuous Waste Activated […]

Read More

Dairy Application: System Solution

One of the largest consumer goods companies in the world and leader in foods and refreshment, health and beauty, and home care markets came to FRC to solve a problem at one of their ice cream facilities.  The plant was generating wastewater with high levels of Total Suspended Solids (TSS) and Fats, Oils, and Grease […]

Read More

Beverage Application: Product Solution

FRC designed a duty/assist Dissolved Air Flotation (DAF) configuration to handle the peak flows coming from the existing screens at a vegetable juice site of a leading international soup and juice producer.   FRC’s solution provided final Total Suspended Solids (TSS) and Fats, Oils and Grease (FOG) polishing prior to discharge.  The effluent water is used […]

Read More

Beverage Application: System Solution

A family-owned producer of award-winning bourbon and fine liquors was generating wastewater of more than 600,000 gpd coming off the existing aerobic biological treatment system. FRC was able to quickly deliver a ”plug and play” DAF System from our rental fleet for an immediate solution.  The results from the rental system were so successful that […]

Read More

Beef Application: System Solution

A privately held company that manufactures value-added meat products, snacks and appetizers in the Midwest and Eastern United States needed DAF units after the anaerobic and aerobic biological treatment systems for their industrial wastewater treatment. Both biological treatment systems have different design data, one mainly for the removal of soluble Biological Oxygen Demand (BOD) and […]

Read More

City of Evergreen

The municipality was looking for a solution to their Total Phosphorus (TP) requirement of less than 1 mg/L as well as removing algae during the summer blooms.    The city chose to use a single FRC DAF and flocculator both constructed out of stainless steel 304, installed outdoors, to reduce overall construction cost.  The small-footprint of […]

Read More

City of Woodruff

The municipality was looking for a biomass separation solution to handle summer algae blooms in their lagoon as well as to reduce the overall Total Phosphorus (TP).  A DAF was demonstrated to be highly effective in removing the algae and TP during trials. Two parallel DAF units were installed with Continuous Stirred Tank Reactors (CSTR) […]

Read More

City of Attalla

Alabama – The municipality was looking for a solution to reduce the overall Total Phosphorus (TP) as well to handle the summer algae blooms in their lagoon. After running a successful pilot trial with a FRC DAF, the solution was clear. FRC was chosen to design a full-scale DAF system based on the pilot trial. […]

Read More

City of Lewiston

This Idaho municipality aimed to thicken Waste Activated Sludge (WAS) from the existing secondary clarifiers before being sent to the digestors. Their existing coated carbon steel DAF units were badly deteriorating.  FRC designed a new stainless-steel DAF system to replace the functionality of the previous system and provide the increased durability and longevity of stainless […]

Read More